Dear Dlubal team,
I am currently analyzing a railway bridge using RFEM6 with a time step analysis. Since my bridge is very long and I want to examine relatively small time steps, I receive the error message "Newmark - the number of time function is over limit 999."
Is it possible to increase this setting somewhere? I would prefer a long computation time rather than fewer time steps.
For your information: this involves a load case combination with 1271 load cases and the same time history. t_max is 70s and the step size delta t is 0.013s.
Best regards,
Philomena Miklos